Network Testing & Commissioning_
Every connection tested before handoff. Complete documentation with OTDR traces, loss measurements, and cable maps for every fiber and copper run.
The Problem_
Untested cable plant is the number one cause of delayed GPU cluster commissioning. A single bad fiber connector in a 5,000-connection deployment can take days to isolate without proper test documentation.
Many contractors skip comprehensive testing or provide only pass/fail results. GPU clusters need full OTDR characterization and link budget verification to ensure reliable operation at 400GbE and 800GbE speeds.
Our Process_
01Test Plan Development
02OTDR Testing
03Insertion Loss Verification
04Return Loss Verification
05Copper Certification
06Visual Fault Location
07Documentation & Reporting
08Acceptance Handoff