Field Guides_
How the work actually gets done.
Guides to GPU infrastructure scope, equipment context, cabling records and handoff responsibilities for buyers and project teams. Review the applicable OEM and facility requirements for your project and use each guide within its stated scope.
Data Center Cabling: Specify the Channel, Scope and Handoff
Define endpoints, cable assemblies, fiber channels, material responsibilities and acceptance evidence before committing to data center cabling.
Read →Complete GuideRack and Stack for Data Centers
What rack and stack means, the full process from receiving to handoff, GPU rack assembly, power and cabling, testing, commissioning, in-house vs outsourced, and choosing a provider.
Read →Buyer's GuideGPU Deployment Providers: Compare Scope and Evidence
Compare proposals by defined work, OEM requirements, people and project evidence, prerequisites and physical handoff. Understand Leviathan's scope before a project discussion.
Read →PlatformsNVIDIA Rubin: Define the Physical Work Package
Use the exact Vera Rubin NVL72 system documents to identify physical interfaces, placement and handling approvals, external cable maps and handoff responsibilities.
Read →InstallationGB200 NVL72 Installation Checklist
Resolve the supplied rack configuration, site releases, field-installed connections and physical handoff evidence before committing to a GB200 NVL72 installation package.
Read →CablingInfiniBand NDR Cabling: Match the Host Connection
Distinguish DGX H100/H200 cluster connections, ConnectX-7 adapter variants and BlueField-3 interfaces before scoping the physical cable package.
Read →CommissioningGPU Cluster Commissioning Workflow
The five-level Cx workflow — factory witness, pre-functional, site acceptance, integrated systems testing under load, and production sign-off — with the gate that must pass before each next level.
Read →TestingGPU Cluster Acceptance Testing: Review the Evidence
Review GPU cluster acceptance results by system, test scope, metric, configuration and exception. Separate physical installation evidence from OEM, platform and facility acceptance.
Read →