Guides to GPU infrastructure scope, equipment context, cabling records and handoff responsibilities for buyers and project teams. Review the applicable OEM and facility requirements for your project and use each guide within its stated scope.

Technical Buyer Guide

Data Center Cabling: Specify the Channel, Scope and Handoff

Define endpoints, cable assemblies, fiber channels, material responsibilities and acceptance evidence before committing to data center cabling.

Read →
Complete Guide

Rack and Stack for Data Centers

What rack and stack means, the full process from receiving to handoff, GPU rack assembly, power and cabling, testing, commissioning, in-house vs outsourced, and choosing a provider.

Read →
Buyer's Guide

GPU Deployment Providers: Compare Scope and Evidence

Compare proposals by defined work, OEM requirements, people and project evidence, prerequisites and physical handoff. Understand Leviathan's scope before a project discussion.

Read →
Platforms

NVIDIA Rubin: Define the Physical Work Package

Use the exact Vera Rubin NVL72 system documents to identify physical interfaces, placement and handling approvals, external cable maps and handoff responsibilities.

Read →
Installation

GB200 NVL72 Installation Checklist

Resolve the supplied rack configuration, site releases, field-installed connections and physical handoff evidence before committing to a GB200 NVL72 installation package.

Read →
Cabling

InfiniBand NDR Cabling: Match the Host Connection

Distinguish DGX H100/H200 cluster connections, ConnectX-7 adapter variants and BlueField-3 interfaces before scoping the physical cable package.

Read →
Commissioning

GPU Cluster Commissioning Workflow

The five-level Cx workflow — factory witness, pre-functional, site acceptance, integrated systems testing under load, and production sign-off — with the gate that must pass before each next level.

Read →
Testing

GPU Cluster Acceptance Testing: Review the Evidence

Review GPU cluster acceptance results by system, test scope, metric, configuration and exception. Separate physical installation evidence from OEM, platform and facility acceptance.

Read →