How the work actually gets done.

Practical, standards-anchored field references for GPU data center deployment — installation checklists, cabling standards, commissioning workflows, and acceptance criteria. Written for the people doing the install, not the people buying it.

Complete Guide

Data Center Cabling: The Complete Guide

The full guide to data center cabling — fiber grades (OM4/OM5/OS2), DAC/AOC/AEC, MPO trunking, the TIA-942/568/606 and BICSI standards, design, testing, and high-density GPU-fabric cabling.

Read →
Complete Guide

Rack and Stack for Data Centers

What rack and stack means, the full process from receiving to handoff, GPU rack assembly, power and cabling, testing, commissioning, in-house vs outsourced, and choosing a provider.

Read →
Buyer's Guide

GPU Deployment Providers: How to Choose

Who builds GPU infrastructure for AI data centers — rack assembly, cabling, networking, commissioning — how to evaluate a provider, and the firms doing the work.

Read →
Platforms

NVIDIA Rubin: The Deployment Guide

What Vera Rubin NVL144 means for power, cooling, and the cable plant — 800V DC, liquid-cooling headroom toward ~600 kW racks, NVLink 6 and 1.6T fabric — plus a prepare-now readiness checklist.

Read →
Installation

GB200 NVL72 Installation Checklist

The installer's sequence for a single NVL72 rack — ~120 kW power, ~1,360 kg chassis, mandatory liquid loop, and a ~2,000-cable plant — with acceptance criteria and the standards each step answers to.

Read →
Cabling

InfiniBand NDR/XDR Cabling Standard

The back-end fabric standard — NDR 400G / XDR 800G, OSFP, MPO polarity discipline, reach selection, TIA-606-C labeling, and IEC 61300-3-35 endface inspection, with per-link acceptance.

Read →
Commissioning

GPU Cluster Commissioning Workflow

The five-level Cx workflow — factory witness, pre-functional, site acceptance, integrated systems testing under load, and production sign-off — with the gate that must pass before each next level.

Read →
Testing

GPU Cluster Acceptance Testing

The acceptance test plan — single-node validation, fabric integrity, NCCL collective bandwidth against the expected envelope, and a thermal burn-in soak, with what counts as a pass and a fail.

Read →