Tools & Calculators_
Free planning tools for GPU data center deployments. Explore racks, power and cooling assumptions for early scoping—from H100/H200 through GB200 and GB300 NVL72.
Original examples using fictional data for cable planning, acceptance records and de-racking documentation.
Download fictional rack inventory observation reconciliation example (Python + CSV ZIP) Read the guide example
Download cable schedule-to-BOM reconciliation example (Python + CSV ZIP)
Download acceptance evidence-package index example (Python + CSV ZIP)
Download de-rack release and destination manifest example (Python + CSV ZIP)
Download port-map record reconciliation example (Python + CSV ZIP)Download offline SSD endurance offer comparison (Python + CSV ZIP)
Download offline artifact transfer quantity comparison (Python + CSV ZIP)
Download offline sample-index coverage worksheet (Python + CSV ZIP)
Download offline record and group split overlap audit (Python + CSV ZIP)
Download offline recovery objective comparison (Python + JSON ZIP)
Download offline PCM manifest byte comparison (Python + JSON ZIP)
Download offline READ completion record arithmetic (Python + JSON ZIP)
Download fictional label-output and reprint reconciliation example (Python + CSV ZIP)
GPU Cluster Deployment Estimator
Enter GPU count + planning example → illustrative rack and power arithmetic, cooling inputs and assumed scale-out positions; no schedule estimate.
Open tool →Power & coolingRack Power & Cooling Calculator
Enter rack power → heat load (BTU/hr), cooling method, coolant flow or airflow, and 3-phase current.
Open tool →