Skip to content

Company

About Leviathan Systems

Leviathan Systems is a hyperscale AI infrastructure deployment company based in Miami, Florida. Specialist field teams integrate, cable, verify and hand off rack-scale GPU systems for clients across the United States.

A long row of open-rear server racks with vertical power distribution units and power cords dressed in repeating loops.
Rack row after installation and cable dressing.

Proof at scale

Mobilization in as little as 24 hours
24h
Racks of hyperscale GB300 deployment experience
1,500+
Deployment crews for the latest NVIDIA platforms
Vera Rubin, GB300, B300

For qualifying engagements, subject to location, project scope, staffing and site access.

01What we do

Physical deployment of GPU and AI infrastructure

Nine services across the life of a rack-scale deployment, for systems including NVIDIA Vera Rubin NVL72, GB300 NVL72 and B300.

  1. 01–02

    Plan & Source

    Hardware received, reconciled and prepared to the approved configuration, with the drawings and schedules the build runs on.
    • 01Hardware installation and preparation
    • 02Technical documentation and handoff
  2. 03–04

    Build & Validate

    High-density fiber and copper installed to the cable schedule, then verified against the approved design before the racks go live.
    • 03Structured fiber and copper cabling
    • 04Physical verification and QA
  3. 05–06

    Deploy & Relocate

    Rack-scale GPU systems deployed across rows, halls and sites, and moved when the program changes.
    • 05Hyperscale GPU rack integration and deployment
    • 06De-racking and relocation
  4. 07–09

    Refresh & Support

    Installed infrastructure kept in service: recommissioning, cabling remediation, equipment replacement and rack refresh.
    • 07Recommissioning support
    • 08Cabling remediation
    • 09Equipment replacement and rack refresh
Built for
Hyperscalers, AI infrastructure operators, GPU cloud providers, data-center developers, colocation operators, systems integrators and infrastructure contractors.
Hardware
Customer-supplied systems from NVIDIA, Dell, Supermicro and Arista, installed to the OEM configuration. See the full equipment list.
Outside our scope
Facility electrical and mechanical work, liquid-cooling installation and cluster software commissioning stay with the facility, the OEM or the responsible trade.

02Problems we solve

The problems we solve

AI capacity is won or lost in the data hall, between equipment arrival and go-live.

  1. 01

    Compressed schedules between arrival and go-live

    Equipment lands in waves against a fixed go-live date. We plan crews and sequence to the delivery schedule.
  2. 02

    Rack-scale density and cabling complexity

    NVL72-class racks put compute, NVLink copper and dense fiber fabrics in every cabinet. Integration and cabling have to be right the first time.
  3. 03

    Scarce specialist field crews

    Technicians with rack-scale GPU experience are hard to find. We bring specialist field crews, scaled to the program.
  4. 04

    Rework from cabling and installation errors

    A mispatched or damaged link found at bring-up costs days. We inspect and verify at installation, while the crew is still on site.
  5. 05

    Phased multi-hall and multi-site expansion

    Capacity arrives hall by hall and site by site. The same lead, methods and labeling carry through every phase.

03Delivery approach

How we deliver

Scope, plan, mobilize, install, verify, hand off. The same six steps on every program.

  1. 01

    Scope

    Equipment, site, schedule and acceptance criteria, agreed before mobilization.

  2. 02

    Plan

    Sequence, crews, tools and materials mapped to the delivery waves.

  3. 03

    Mobilize

    Field crews and supervision on site to the program schedule.

  4. 04

    Install

    Racks integrated, positioned and cabled to the approved design.

  5. 05

    Verify

    Physical inspection and QA of every rack and link.

  6. 06

    Hand off

    Documentation and a clean handoff to your operations team.

Program lead
One accountable lead per program, from scope to handoff.
Crews
Scaled to the program: rack count, phases and site windows.
A row of closed mesh-door racks in a data hall, with cabling visible behind the doors.
Installed racks in a data hall.

Rapid response

Proposal Friday. Crew on site Monday.

04Team & experience

Team and experience

Hands-on experience with hyperscale AI infrastructure at rack scale.

Chief Executive Officer (CEO)

Dawid Siekiera

Dawid Siekiera on LinkedIn

The rear of an integrated rack: fiber bundles strapped down both sides break out to stacked servers between two vertical power units.
Rack integration and fiber dressing.

Contact

Bring us your next deployment

Book a call to discuss your program, or request a deployment team with the scope, site and schedule.