Arista Network Infrastructure Deployment

Arista supplies Ethernet switching used in data-center fabrics. Leviathan mounts, cables, labels and checks it against the customer-approved design. Network configuration and cluster acceptance stay with the network and platform teams.

Braided-sleeve cable bundles, strapped with hook-and-loop ties, sweeping in a matched radius toward switch ports.
Braided bundles, strapped and dressed to the port.

01Why Arista

Why Arista in GPU Infrastructure

GPU architectures may have separate scale-up and scale-out networks. NVLink can connect GPUs within a supported node or rack domain; external fabrics can use Ethernet or InfiniBand. Arista Ethernet switches are one possible scale-out component, selected through the customer network design.

The network fabric is not secondary infrastructure in a GPU cluster — it is a performance-critical component. A single miscabled switch uplink, a fiber connector with marginal insertion loss, or an improperly tested link can degrade training performance across hundreds of GPU nodes. The network is compute performance.

An open rack with fiber breakouts dressed tier by tier into stacked panels between vertical cable managers.
Fiber breakouts dressed tier by tier.

02

What We Deploy

  • Leaf Switches

    Leaf switches connect the specified server ports into a customer-designed fabric. Agree physical placement, permitted cables, labels and port-map checks.
  • Spine Switches

    Aggregation switches that connect leaf switches into a full fabric. Spine switches handle east-west traffic between GPU nodes in different racks. Correct cabling between leaf and spine layers is essential for balanced fabric performance.
  • Fabric Cabling

    Fiber, DAC, AOC and AEC links have different reach, connector and compatibility constraints. Installed to the interconnect types in the approved switch and server BOM.
  • MPO/MTP Trunking

    MPO/MTP trunks can consolidate fiber connections where the approved design specifies them. Confirm polarity, connector type, fiber count, reach and routing before installation.

03Deployment scope

Our Arista Deployment Scope

  1. 01

    Switch Installation

    Mount and secure the specified Arista equipment to the approved rack plan; connect labeled physical management/network cables.
  2. 02

    Structured Cabling

    Install the agreed fiber/DAC/AOC/AEC links and label both ends against the customer-approved port map. Cable compatibility, reach, bend radius, pathways and separation follow the applicable OEM/site design.
  3. 03

    Physical Connectivity Checks

    Document agreed visual, cable-ID, label, physical-connectivity and defect checks. OTDR/OLTS or copper certification is planned with its method and acceptance criteria.
  4. 04

    Documentation

    Port-to-port records, labels, photos, defect register and rack documentation, agreed before work. Instrument-test reports and CAD formats are added where the project calls for them.

04Integration

Cross-Vendor Integration

Arista ports may connect to Dell, Supermicro or other servers with NVIDIA GPUs. Reconcile the exact adapter/switch BOM, compatible cables, connectors and port map across those interfaces, and assign physical versus configuration/performance handoffs before work.

Discuss the exact equipment, scope, site permissions and available field resources before scheduling work across those interfaces.

Contact

Discuss Your Infrastructure Project

Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.