Arista Network Infrastructure Deployment_
Arista supplies Ethernet switching used in data-center fabrics. Leviathan can scope physical rack mounting, cabling, labels and documented checks against a customer-approved design. Network configuration, collective-performance testing and cluster acceptance remain separate responsibilities.
Identify the appointed equipment/material supplier, approved configuration, quantities and delivery responsibilities before agreeing the physical work. Confirm the exact model and OEM authority; this page does not claim Arista partner or authorized reseller status or available inventory.
Why Arista in GPU Infrastructure_
GPU architectures may have separate scale-up and scale-out networks. NVLink can connect GPUs within a supported node or rack domain; external fabrics can use Ethernet or InfiniBand. Arista Ethernet switches are one possible scale-out component, selected through the customer network design.
The network fabric is not secondary infrastructure in a GPU cluster — it is a performance-critical component. A single miscabled switch uplink, a fiber connector with marginal insertion loss, or an improperly tested link can degrade training performance across hundreds of GPU nodes. The network is compute performance.
What We Deploy_
Leaf Switches
Leaf switches connect the specified server ports into a customer-designed fabric. Agree physical placement, permitted cables, labels and port-map checks; design oversubscription and performance acceptance belong to the network owner.
Spine Switches
Aggregation switches that connect leaf switches into a full fabric. Spine switches handle east-west traffic between GPU nodes in different racks. Correct cabling between leaf and spine layers is essential for balanced fabric performance.
Fabric Cabling
Fiber, DAC, AOC and AEC links have different reach, connector and compatibility constraints. Install only the interconnect types included in the approved switch/server BOM and work scope; the customer/OEM network team approves link selection.
MPO/MTP Trunking
MPO/MTP trunks can consolidate fiber connections where the approved design specifies them. Confirm polarity, connector type, fiber count, reach and routing before installation; planning deliverables and instrument certification need explicitly agreed scope.
Our Arista Deployment Scope_
Switch Installation
Mount and secure the specified Arista equipment to the approved rack plan; connect labeled physical management/network cables. Configuration, energization and system acceptance have separate customer/OEM owners.
Structured Cabling
Install the agreed fiber/DAC/AOC/AEC links and label both ends against the customer-approved port map. Cable compatibility, reach, bend radius, pathways and separation follow the applicable OEM/site design; no blanket compliance certification is promised.
Physical Connectivity Checks
Document agreed visual, cable-ID, label, physical-connectivity and defect checks. OTDR/OLTS/copper certification is not a default service; confirm equipment, qualified personnel, method and acceptance requirements before including instrument testing.
Documentation
Agree port-to-port records, labels, photos, defect register and available rack documentation before work. Instrument-test reports or specific CAD formats are included only when the supporting resources and deliverable requirements are confirmed.
Cross-Vendor Integration_
Arista ports may connect to Dell, Supermicro or other servers with NVIDIA GPUs. Reconcile the exact adapter/switch BOM, compatible cables, connectors and port map across those interfaces, and assign physical versus configuration/performance handoffs before work.
Discuss the exact equipment, scope, site permissions and available field resources before scheduling work across those interfaces.
Related Services_
Ready to deploy Arista network infrastructure? Contact us →
Discuss Your Infrastructure Project_
Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.
Discuss a ProjectEmail Project Scope