Skip to content

Hardware

The equipment we install and integrate.

Leviathan installs and integrates the equipment of the agreed project package: rack assembly, placement, cabling, remediation, planning and documented physical handoff.

Tiers of fiber breakout legs seated in high-density panel ports, each group gathered by a strap and fed through metal cable managers.
High-density fiber patching, tier by tier.

01Compute & GPU

Compute & GPU

The accelerated-compute platforms at the center of every build.

  • NVIDIA

    GPU servers and rack-scale systems, including Vera Rubin NVL72, GB300 NVL72 and B300. Assembly and cabling follow the exact OEM model and the agreed scope.
  • Dell

    PowerEdge GPU server platforms. Agree rack placement, rail installation, physical cabling, labels and handoff from the exact Dell model documents.
  • Supermicro

    GPU server systems for AI and HPC. Confirm the exact Supermicro rails, airflow, cable interfaces and customer-approved rack plan.

02Networking & Fabric

Networking & Fabric

The switching, routing, and security layer that turns nodes into a cluster.

  • Arista

    Ethernet switches for GPU fabrics. Physical mounting, cable routing, labels and port-map verification.
  • Juniper Networks

    Switching and routing equipment. Agree rack mounting, physical cable connections and documented checks against the approved port map.
  • Palo Alto Networks

    Network security appliances. Physical mounting and cabling to the approved port map.
  • Netgear

    Management switching. Physical mounting, cabling and physical-connectivity checks.
  • CommScope

    Structured-connectivity products. Agree pathways, labels and installation requirements against the exact OEM/site plan.

03

Storage

High-performance storage feeding the training pipeline.

  • Pure Storage

    Storage systems. Physical mounting and cabling to the approved rack plan.

04

Facility Power & Cooling Interfaces

Facility systems the rack work connects to; their installation and commissioning sit with the facility and OEM teams.

  • Vertiv

    Facility power, UPS and cooling products at the site. Rack placement and cabling are planned around their interfaces.

  • Megmeet

    Power electronics specified by the OEM. Their interfaces are identified in the rack plan before installation.

05

Cabling & Connectivity

The optical and copper plant the cluster runs on.

  • Corning

    Fiber and connectivity products. Routing, labeling and physical checks to the approved design.

06

Out-of-Band Management

Independent access to keep the build serviceable.

  • Opengear

    Console servers and out-of-band equipment. Physical mounting and cabling to the approved port map.

A long row of open-rear server racks with vertical power distribution units and power cords dressed in repeating loops.
Rack row after installation and cable dressing.

Rapid response

Proposal Friday. Crew on site Monday.

07Vendor-agnostic

Vendor-agnostic by design

A GPU project can combine compute, server, network, storage and connectivity vendors. The physical port map and handoff register must match the approved design across those interfaces.

Trademark notice

Product names, brands and trademarks belong to their respective owners and identify the equipment we install. Their use implies no partnership, endorsement or certification.

Contact

Discuss Your Infrastructure Project

Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.