Hardware
The equipment we install and integrate.
Leviathan installs and integrates the equipment of the agreed project package: rack assembly, placement, cabling, remediation, planning and documented physical handoff.

01Compute & GPU
Compute & GPU
The accelerated-compute platforms at the center of every build.
NVIDIA
GPU servers and rack-scale systems, including Vera Rubin NVL72, GB300 NVL72 and B300. Assembly and cabling follow the exact OEM model and the agreed scope.Dell
PowerEdge GPU server platforms. Agree rack placement, rail installation, physical cabling, labels and handoff from the exact Dell model documents.Supermicro
GPU server systems for AI and HPC. Confirm the exact Supermicro rails, airflow, cable interfaces and customer-approved rack plan.
02Networking & Fabric
Networking & Fabric
The switching, routing, and security layer that turns nodes into a cluster.
Arista
Ethernet switches for GPU fabrics. Physical mounting, cable routing, labels and port-map verification.Juniper Networks
Switching and routing equipment. Agree rack mounting, physical cable connections and documented checks against the approved port map.Palo Alto Networks
Network security appliances. Physical mounting and cabling to the approved port map.Netgear
Management switching. Physical mounting, cabling and physical-connectivity checks.CommScope
Structured-connectivity products. Agree pathways, labels and installation requirements against the exact OEM/site plan.
03
Storage
High-performance storage feeding the training pipeline.
Pure Storage
Storage systems. Physical mounting and cabling to the approved rack plan.
04
Facility Power & Cooling Interfaces
Facility systems the rack work connects to; their installation and commissioning sit with the facility and OEM teams.
Vertiv
Facility power, UPS and cooling products at the site. Rack placement and cabling are planned around their interfaces.
Megmeet
Power electronics specified by the OEM. Their interfaces are identified in the rack plan before installation.
05
Cabling & Connectivity
The optical and copper plant the cluster runs on.
Corning
Fiber and connectivity products. Routing, labeling and physical checks to the approved design.
06
Out-of-Band Management
Independent access to keep the build serviceable.
Opengear
Console servers and out-of-band equipment. Physical mounting and cabling to the approved port map.

Rapid response
Proposal Friday. Crew on site Monday.
07Vendor-agnostic
Vendor-agnostic by design
A GPU project can combine compute, server, network, storage and connectivity vendors. The physical port map and handoff register must match the approved design across those interfaces.
Trademark notice
Product names, brands and trademarks belong to their respective owners and identify the equipment we install. Their use implies no partnership, endorsement or certification.
Contact
Discuss Your Infrastructure Project
Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.