Dell Infrastructure Deployment

Dell supplies GPU server platforms with model-specific rack, rail, electrical, cooling and network requirements. Leviathan installs and cables client-supplied Dell systems to those documents, through to a documented physical handoff.

A contained aisle of mesh-door racks beside an open rack with fiber breakouts patched tier by tier into stacked panels.
Structured fiber cabling in a contained aisle.

01

What We Deploy

Dell builds GPU server platforms that range from single-GPU workstation servers to 8-GPU training nodes designed for large-scale AI clusters. These platforms house NVIDIA HGX baseboards with H100, H200, or Blackwell GPUs, along with high-speed networking from Arista or other switch vendors.

Before installation, identify the exact Dell server, rail kit, rack elevation, service clearances and approved port map. Agree placement, physical cable routing, labels and handoff records.

Liquid-cooled Dell systems add facility interfaces; their readiness is confirmed before placement and cabling are scheduled.

Two adjacent racks from the rear: braided trunk bundles break out in even pairs to a column of server sleds.
Breakout cabling dressed to each server.

02Deployment scope

Our Dell Deployment Scope

  1. 01

    Rack Assembly

    Rail installation, server and switch placement, PDU mounting, and cable management. Every component positioned per the Dell reference architecture for optimal airflow and serviceability.
  2. 02

    Agreed Equipment Cord Scope

    Server-to-rack-PDU cords for approved equipment, where the OEM, site and project scope allow it.
  3. 03

    Network Cabling

    Route client-approved fiber, DAC, AOC or AEC cables between the specified server and switch ports. Confirm connector compatibility, reach, bend radius, pathways and labeling from the OEM/site cable plan.
  4. 04

    NVLink and InfiniBand

    HGX internal NVLink assemblies and external Ethernet/InfiniBand cables are distinct interfaces. Physical connections follow the purchased server's OEM documentation and the work scope.
  5. 05

    Physical Verification and Handoff

    Visual, cable-ID, label, physical-connectivity and defect checks with the handoff record. OTDR/OLTS or copper certification is planned with its method and acceptance criteria.
  6. 06

    Liquid-Cooled Systems

    For liquid-cooled Dell systems, the OEM and the facility's cooling contractor own CDU installation, manifolds, fluid connections, leak and pressure tests and thermal commissioning; our crews place, cable and verify the IT equipment.

03Integration

Cross-Vendor Integration

A deployment may combine Dell servers, NVIDIA GPUs and separately supplied switches. Agree compatible adapters/cables, port maps, labels and the handoff owner for each interface.

Contact

Discuss Your Infrastructure Project

Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.