LEVIATHAN SYSTEMS

Infrastructure Services_

From approved hardware requirements and receiving to rack integration, hardware QA, onsite deployment and the next physical refresh. Choose a complete delivery package or the stage your project needs.

Plan & Source

Translate equipment requirements into physical plans, receiving inputs and a preparation scope. Identify the appointed supplier, approved configuration and delivery responsibilities before assembly begins.

01

Rack assembly & preparation

Reconcile identified deliveries, prepare equipment and assemble the approved rack package with configuration, receiving and handoff records.

Explore Rack assembly & preparation
02

Physical planning & CAD

Discuss layouts, cable routes, point-to-point schedules, labels and material documentation; authoring capability and outputs are confirmed per engagement.

Explore Physical planning & CAD

Build & Validate

Bring the physical build together before deployment. Rack assembly, pre-integration and hardware burn-in with an agreed test plan, traceable records and a clear disposition for exceptions.

01

Hardware burn-in & validation

Hardware QA against an agreed configuration, test plan, resources and acceptance criteria, with results and exceptions documented.

Explore Hardware burn-in & validation
02

Rack-and-stack installation

Install agreed enterprise or GPU equipment to approved rack positions, mounting instructions and reviewed handling conditions.

Explore Rack-and-stack installation
03

Structured cabling & fiber

Install the agreed fiber and copper pathways, route and dress cables, identify endpoints and document the agreed physical installation.

Explore Structured cabling & fiber

Deploy & Relocate

Connect the equipment to its destination. Onsite rack installation, structured cabling and physical relocation, coordinated around access, inventory, handling and site readiness.

01

Complete physical deployment

Connect receiving, rack integration, hardware QA, onsite deployment and cabling in one defined physical delivery package.

Explore Complete physical deployment
02

Equipment relocation

Coordinate equipment inventory, removal, handling, logistics, receiving and destination reinstallation within an agreed custody and site plan.

Explore Equipment relocation
03

Colocation installation

Coordinate customer-side rack and cabling work inside an authorized third-party facility; hosting and facility services remain with the provider.

Explore Colocation installation
04

DSX POD Physical IT Installation Support

Scope the approved receiving, IT cabling, labels and physical handoff around a partner-supplied DSX POD project, with resources and specialist interfaces agreed per engagement.

Explore DSX POD Physical IT Installation Support

Refresh & Support

Schedule physical support, equipment replacement, recabling, remediation and refresh. Coordinate removal or decommissioning with assigned owners, revised records and a clear destination for each affected asset.

01

Hardware refresh & physical support

Carry out agreed physical remediation, equipment replacement and lifecycle work, with revised installation records, scope approval and assigned open items.

Explore Hardware refresh & physical support
02

Physical Equipment De-Racking

Scope authorized physical equipment removal, identity and connection records, and the next handoff without assuming data destruction or destination reinstallation.

Explore Physical Equipment De-Racking

Need a defined measurement or inspection package? See physical verification and documentation. For liquid-side scope boundaries, read the cooling responsibility guide.

One physical lifecycle. The stages you need.

Purchase an individual stage or coordinate several within the same engagement. Agree the release conditions and handoff between stages.

  1. Plan

    Release physical layouts, rack elevations, cable schedules, label rules and the project sequence.

  2. Confirm supply inputs

    Reconcile the approved BOM, supplier-confirmed configuration, appointed purchasing owner and delivery arrangements before receiving or assembly.

  3. Receive

    Inspect condition, capture serial numbers, reconcile inventory, tag, kit and stage the equipment.

  4. Assemble

    Build the cabinet and mount the equipment to the released configuration, with first-build checks and repeatable records.

  5. Cable

    Install and patch the agreed fiber and copper connections, then route, dress, label and record them.

  6. Verify / Burn-in

    Perform the approved physical checks or hardware test procedure, recording conditions, results, exceptions and acceptance.

  7. Deliver / Relocate

    Coordinate packing, transport, destination receiving, onsite installation and the physical reinstallation package.

  8. Support

    Schedule physical support, recabling, replacement, remediation, refresh, removal and decommissioning coordination.

Start with your delivery question

Neocloud and GPU infrastructure operators

How do we turn one approved rack build into a repeatable rollout?

Connect the exact GPU/server configuration, supplier-confirmed equipment record, first-build record, dense cable schedule and approved hardware checks. Define which changes require a fresh build release before equipment reaches the next site.

Scope equipment preparation and rack integration

Colocation operators and tenants

Who releases the customer-side installation inside the facility?

Separate tenant equipment, receiving and cage/rack work from provider-controlled access, pathways and cross-connects. Use the approved facility window and physical handoff to coordinate installation, refresh or a move.

Define the colocation installation package

Enterprise IT teams

How do we refresh or consolidate equipment without losing the asset record?

Identify the source equipment, destination assignment, removal and transport requirements, custody handoffs and replacement plan. Reconcile what arrived and what was reinstalled; application and data migration remain separate.

Plan the physical equipment relocation

Systems integrators and infrastructure contractors

Which physical work package can we hand to an execution team?

Define rack assembly, overflow installation capacity or cabling work against released drawings, first-build QA and a named change approver. Agree site interfaces, work windows and closeout records before committing the field package.

Discuss a coordinated physical deployment

Define the project boundaries

No liquid-cooling installation, connections, disconnections, testing, commissioning or maintenance; no CDU or cooling-loop work; no licensed professional engineering or stamped drawings; no default facility electrical, structural or rigging responsibility; BIOS, firmware, IP configuration, OS imaging and complete software commissioning are not standard services.

Hardware burn-in and QA require an agreed equipment configuration, method, resources, duration, acceptance parameters and results record. Physical verification may include visual inspection, cable identification, labeling checks, physical connectivity checks, defect recording and agreed handoff documentation. OTDR, OLTS, copper certification and other formal tests require confirmation of equipment, personnel, method and acceptance criteria for the specific engagement.

Discuss Your Infrastructure Project_

Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.

Discuss a ProjectEmail Project Scope