NVIDIA Infrastructure Deployment
Leviathan specializes in physical GPU infrastructure work for customer-supplied equipment, including the latest NVIDIA platforms: Vera Rubin NVL72, GB300 NVL72 and B300. Each NVIDIA-based project is built from the exact OEM assembly, handling and cable documentation and the site approval.

01Platforms
Platforms We Deploy
Latest NVIDIA platforms
Vera Rubin NVL72 (Rubin)
Vera Rubin NVL72 combines 72 Rubin GPUs and 36 Vera CPUs with HBM4 memory and NVLink 6. The next rack-scale platform we are ready to deploy, planned from the purchased OEM product and approved site documents.GB300 NVL72 (Blackwell Ultra)
GB300 NVL72 combines 72 Blackwell Ultra GPUs and 36 Grace CPUs; NVIDIA lists roughly 20 TB aggregate GPU memory. Installed from model-specific installation documents and an approved physical port map; our team brings 1,500+ racks of hyperscale GB300 deployment experience.B300 (Blackwell Ultra)
HGX B300 and DGX B300 systems carry eight Blackwell Ultra GPUs each. Rails, rack placement, cable plans and physical verification follow the exact OEM model and the purchased system documentation.
Earlier platforms
GB200 NVL72 (Blackwell)
GB200 NVL72 combines 72 Blackwell GPUs and 36 Grace CPUs. The DGX reference uses 18 compute trays and liquid-cooled CPU/GPU components with ancillary airflow. Exact OEM input, cooling and placement requirements are supplied with the project.GH200 (Grace Hopper Superchip)
Unified CPU+GPU architecture combining the NVIDIA Grace CPU and Hopper GPU on a single module. Connected via NVLink-C2C for high-bandwidth, low-latency data transfer between CPU and GPU memory. A fundamentally different deployment topology than standard GPU servers.H200 (Hopper + HBM3e)
H200 has 141 GB HBM3e. NVIDIA describes HGX H100 infrastructure compatibility, but an upgrade still requires explicit OEM-supported configuration, firmware and site checks; it is not permission to swap GPUs into any server.H100 (Hopper Architecture)
H100 SXM has 80 GB HBM3 and configurable TDP up to 700 W; H100 NVL differs. DGX/HGX and other OEM servers have model-specific rack, cord and cooling requirements. Use the purchased server documentation rather than GPU TDP as a rack design.
02
What We Deploy
DGX Systems
NVIDIA DGX systems have model-specific installer requirements. Its DGX H100/H200 guide requires partner-network personnel or NVIDIA field-service engineers for system installation. Confirm the approved installer and the surrounding physical scope before work. Other DGX/OEM products have their own authorization, handling and handoff documents.HGX Platforms
NVIDIA HGX is a GPU baseboard integrated into OEM server products. Customer equipment may arrive factory assembled; internal baseboard, GPU or chassis service is a separate OEM task. Identify the exact OEM-approved physical work, rack/rail requirements and external port map before installation.NVLink and InfiniBand
Supported GPU systems can use NVLink within a node/rack domain and Ethernet or InfiniBand for external scale-out traffic. The exact OEM architecture determines each physical interface. Agree connector compatibility, cable reach, routing, labels and port records.
03Deployment services
Our NVIDIA Deployment Services
The scope can include rack assembly, structured cabling, colocation installation, remediation and planning deliverables. Liquid-cooling installation, facility electrical construction and cluster software commissioning stay with the OEM, facility and platform teams.
01
GPU Rack Assembly & Integration
Rack assembly, placement and integration to the OEM configuration02
03
Physical Verification & Handoff
Visual, cable-ID, label, physical-connectivity and defect checks with the handoff record04
Cooling Scope & Prerequisites
What must be ready before liquid-cooled racks are placed and cabled
04Planning
Planning Your Installation
Start with the equipment BOM, rack elevations, cabling plan, site access and OEM installer requirements. Agree the permitted physical checks, handoff deliverables, responsible specialist teams and available resources before scheduling work.
Ready to deploy NVIDIA infrastructure?Book a Call