NVIDIA B300 Infrastructure & Deployment
For B300 installation, agree rails, rack placement, cable plans, physical verification and handoff. OEM HGX servers and Grace Blackwell GB300 NVL72 racks require different installation inputs; confirm the cooling and electrical design for the specified system.

01NVIDIA B300
What Is the NVIDIA B300?
The B300 is part of the Blackwell Ultra architecture. NVIDIA currently lists 279 GB HBM3e in its Blackwell Ultra datasheet and describes increased dense FP4 compute compared with Blackwell. Confirm the exact OEM SKU and distinguish advertised compute throughput from measured application performance.
It ships as the 8-GPU HGX B300 and, at rack scale, as the GB300 NVL72 — the DGX GB reference has four GPUs and two Grace CPUs per tray, with 72 GPUs per rack. NVL72 uses liquid-cooled compute; HGX server cooling must be checked by model.
02Specifications
B300 Specifications
- Architecture
- Blackwell UltraDual-die, refreshed Blackwell
- Memory
- 279 GB HBM3eIn current Blackwell Ultra datasheet; check SKU
- FP4 Performance
- ~1.5x B200Dense, tuned for reasoning/inference
- GPU Interconnect
- NVLink 51.8 TB/s per GPU
- Common Form Factors
- HGX B300 (8-GPU)GB300 NVL72 compute tray (4 GPUs/tray)
- Networking
- ConnectX-8 800GQuantum-X800 InfiniBand
- TDP
- Exact OEM GPU/server power and cooling specification
- Power Architecture
- Exact OEM input; do not infer from 800V DC roadmap
03Deployment scope
Our B300 Deployment Scope
Rack-and-stack installation, cabling and physical verification for NVIDIA HGX B300 and DGX B300 systems.
01
Hyperscale GPU rack integration and deployment
Receiving, positioning and integration of rack-scale GPU systems across rows, halls and phases.02
Structured fiber and copper cabling
High-density fiber and copper installed, dressed and labeled to the approved cable schedule.03
Hardware installation and preparation
Servers, switches, optics and rack components prepared and installed to the exact OEM configuration.04
Physical verification and QA
Inspection against the approved configuration, agreed physical-layer testing and remediation.05
Technical documentation and handoff
Labels, cable records and as-built documentation, handed to the owner or the next contractor.
04What changes
B200 → B300: What Changes for Deployment
Memory and Mechanical Compatibility
NVIDIA lists roughly 20 TB of GPU memory for GB300 NVL72. OEM mechanical interfaces, trays and service access must be checked rather than assuming that GB200 hardware, cooling or manifolds carry over.Higher Power Density
Obtain the exact server/rack power and thermal requirements before facility approval. Upstream power, CDU and flow design, liquid connections, leak tests and commissioning belong to the qualified electrical, mechanical and OEM specialists.Power Inputs & ConnectX-8
The DGX GB300 reference uses 800G ConnectX-8 networking. Match cables/ports to the approved fabric BOM. NVIDIA 800V DC roadmaps describe separate infrastructure architectures and do not establish every GB300 rack input; the exact OEM electrical design governs.

Latest platforms
Crews ready for the latest NVIDIA platforms.
05Different units
B300, HGX B300, DGX B300 and GB300 are different units
A GPU name does not identify a complete delivery. NVIDIA's HGX specifications distinguish the eight-GPU Blackwell Ultra baseboard from a complete server. The DGX B300 system specification describes a complete system with eight Blackwell Ultra SXM GPUs, Intel Xeon processors, storage and network interfaces in a 10U enclosure. The GB300 NVL72 reference instead combines 72 Blackwell Ultra GPUs and 36 Grace CPUs in a liquid-cooled rack-scale platform.
| Name in the request | Source-qualified unit | Physical decision still required |
|---|---|---|
| B300 GPU | An accelerator identity within the named Blackwell Ultra system. | Which complete OEM system and supported configuration is being delivered? |
| HGX B300 | NVIDIA's eight-GPU baseboard platform. | Identify the actual server enclosure, cooling, power interfaces and OEM installation instructions. |
| DGX B300 | The cited complete eight-GPU, Intel-based 10U system. | Confirm its exact variant, mounting and connection requirements, delivered state and authorized task boundaries. |
| GB300 NVL72 | The cited rack-scale configuration with 72 GPUs and 36 Grace CPUs. | Identify the offered rack configuration and the separate facility, liquid-side, OEM and system-acceptance responsibilities. |
06System interfaces
Compare the complete B200 and B300 system interfaces
A concrete change is visible in NVIDIA's named DGX systems. Its DGX B200 specification lists four OSFP fabric ports serving eight single-port ConnectX-7 adapters. The cited DGX B300 page lists eight OSFP fabric ports serving eight single-port ConnectX-8 adapters. Both describe eight-GPU systems and a 10U chassis height. Thus the same GPU count and nominal height can accompany a different physical port presentation.
| Comparison field | DGX B200 | DGX B300 |
|---|---|---|
| GPU population | Eight Blackwell GPUs | Eight Blackwell Ultra SXM GPUs |
| Source-listed chassis height | 10 RU | 10U |
| Fabric OSFP ports and adapters | Four ports serving eight single-port ConnectX-7 adapters | Eight ports serving eight single-port ConnectX-8 adapters |
Only these named product fields are compared. No host interoperability, actual rack fit, channel count, loss or reach limit, installation method, conversion, warranty or performance conclusion follows from the table.
07Inference rack
An inference rack describes a use case before it describes a delivery
Inference is not a unique enclosure or installation boundary. NVIDIA describes DGX B300 for inference and training, while GB300 NVL72 is presented for reasoning and test-time scaling. An offer described only as a Blackwell enterprise inference rack has therefore not identified whether it contains complete x86-based servers, an OEM HGX integration or the Grace-based rack-scale configuration. Ask for the actual product population and integration state before comparing physical work.