GPU platforms
NVIDIA H100 GPU Infrastructure & Deployment
NVIDIA H100 systems support AI training and inference in several server configurations. Agree the exact OEM model, rack elevation and cable plan before physical installation.

01NVIDIA H100
What Is the NVIDIA H100?
The NVIDIA H100 uses the Hopper architecture. H100 SXM has 80 GB of HBM3 memory; the H100 NVL PCIe variant has different memory, power and interconnect specifications. Match the supplied server SKU to its OEM documentation rather than treating H100 as one rack design.
DGX, HGX and OEM H100 systems have distinct installation requirements. NVIDIA requires DGX H100/H200 installation by its partner-network personnel or field-service engineers. Confirm the authorized installer and OEM requirements before scoping the surrounding site, rack and cable work.
02Specifications
Technical Specifications
- Architecture
- Hopper
- GPU Memory
- 80 GB HBM3H100 SXM; other SKUs differ
- TDP
- Up to 700 WH100 SXM; configurable
- Interconnect
- NVLink 4.0InfiniBand NDR
- Platform
- DGX H100, HGX H100
- Networking
- OEM-selected Ethernet or InfiniBand adapters
- Cooling
- OEM server cooling configuration
- Power per Rack
- Exact OEM system and rack design required
03Deployment scope
Our H100 Deployment Scope
Specialist crews for every physical stage of a GPU deployment, coordinated with OEMs, facility operators and other trades.
01
Hyperscale GPU rack integration and deployment
Receiving, positioning and integration of rack-scale GPU systems across rows, halls and phases.02
Structured fiber and copper cabling
High-density fiber and copper installed, dressed and labeled to the approved cable schedule.03
Hardware installation and preparation
Servers, switches, optics and rack components prepared and installed to the exact OEM configuration.04
Physical verification and QA
Inspection against the approved configuration, agreed physical-layer testing and remediation.05
Technical documentation and handoff
Labels, cable records and as-built documentation, handed to the owner or the next contractor.
04Deployment
Deployment Considerations
Power Distribution
The customer and qualified facility electrical team confirm the exact server input, rack PDU, upstream capacity and permitted connection method. GPU TDP alone does not specify a rack circuit.Structured Cabling
Use the customer-approved port map, adapter and switch BOM to select Ethernet or InfiniBand cables. Connector type, reach, fiber polarity and routing depend on that design; preserve service access and label both ends.Cooling
Confirm the exact server cooling configuration and facility approval before delivery. Where an OEM system uses liquid cooling, the OEM and the facility's cooling contractor own every liquid-side activity.

05Form factor
Compare the H100 form factor and the complete host
SXM and PCIe are different physical form-factor descriptions. H100 NVL is one named PCIe example here, not a complete catalogue of every earlier H100 PCIe SKU. NVIDIA’s March 22, 2022 architecture article distinguishes the H100 SXM5 module and PCIe Gen5 board form factors. [N3] The current H100 table also lists PCIe Gen5 I/O for SXM: a PCIe bus connection therefore does not, by itself, identify a PCIe add-in card. [N1]
| Comparison | H100 SXM example | H100 NVL PCIe example | Buyer consequence |
|---|---|---|---|
| GPU form factor | The H100 product table identifies SXM. | The same table identifies PCIe, dual-slot, air-cooled. | These are not interchangeable card descriptions. Request the selected server’s supported GPU configuration instead of choosing a module from a family name. |
| Complete server | NVIDIA lists HGX H100 partner systems with four or eight GPUs and DGX H100 with eight. | Its NVL column lists partner systems with one to eight GPUs. | A GPU option is not the enclosure, rack height, mounting package, external port list or site load of every server that can contain it. |
| Interconnect and cooling package | Use the selected HGX or complete-system documentation for its actual integration. | NVIDIA describes an NVLink-bridge NVL arrangement, but that overview does not approve the offered server’s population or bridge layout. | Retain the actual OEM GPU, thermal and interconnect options together. A similar GPU count or connector description is not a server-conversion instruction. |
Source: N1 — NVIDIA H100 product specifications and NVL description, checked 19 October 2026. Only the named form factors and server-option descriptions are used here. Performance, prices, software entitlements, rack power, product availability and actual system compatibility are not inferred.
N3 — NVIDIA Hopper Architecture In-Depth, March 22, 2022, checked 19 October 2026. Only the distinct module and board descriptions are used; preliminary performance figures and later product applicability are excluded.
06Airflow path
Confirm the OEM airflow path at the system boundary
H100 or H200 does not by itself identify a server’s intake and exhaust faces. NVIDIA’s named DGX H100/H200 environmental table describes front-to-back airflow at a stated fan condition. That is evidence about the named complete system, not every OEM server using either GPU. Keep the direction, condition and source revision together rather than treating an isolated airflow figure as a universal facility requirement. [N2]
| Confirm with the OEM and appointed site owner | Why the exact input matters |
|---|---|
| Exact server and thermal configuration; identified intake and exhaust faces | A GPU label, fan photograph or drawing viewed from the opposite side does not identify the installed system’s permitted orientation. |
| Applicable airflow information and the operating conditions behind it | Keep a condition-qualified equipment statement separate from the actual room’s airflow distribution, cooling capacity and facility approval. |
| OEM intake, exhaust and service-access requirements against the proposed cabinet arrangement | Ask the responsible reviewers to assess doors, neighboring equipment and the planned cable-management package. This table supplies no clearance value, obstruction tolerance or layout approval. |
| Current installation drawing, source reference and unresolved interface decision | The physical team needs the released arrangement, not permission to reverse fans, change a cooling package or relocate an inlet because a drawing is ambiguous. |
Source: N2 — NVIDIA DGX H100/H200 hardware and environmental specification, checked 19 October 2026. Only the named system and condition-qualified airflow direction are used. This page does not adopt its numerical operating limits or provide a site survey, thermal design, fan procedure, engineering or OEM work approval.
07Platforms
Contact
Discuss Your Infrastructure Project
Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.