GPU platforms
NVIDIA B200 Infrastructure & Deployment
Blackwell systems include x86 HGX B200 servers and Grace Blackwell GB200 NVL72 racks with different physical interfaces. Leviathan delivers client-supplied equipment placement, rack assembly, cabling, labeling and documented physical checks; electrical, liquid-side and software work stays with the specialist teams.

01NVIDIA B200
What Is the NVIDIA B200?
Blackwell GPUs use two dies presented as one GPU package through the NV-HBI interconnect. NVIDIA lists 180 GB HBM3e for the HGX B200 reference GPU; Grace Blackwell rack products have different published memory totals. Precision, sparsity, software and workload must be stated when comparing performance.
Blackwell-based equipment includes OEM-configured HGX B200 eight-GPU server platforms and the separately specified GB200 NVL72 rack with Grace CPUs and Blackwell GPUs. Rails, tray interfaces, cabling, power and cooling requirements depend on the exact OEM documents; confirm permitted physical work and separately owned specialist interfaces before scheduling.
02Specifications
B200 Specifications
- Architecture
- BlackwellDual reticle-limited dies, 208B transistors
- Memory
- 180 GB HBM3eIn HGX B200 reference; up to 8 TB/s
- Die Interconnect
- NV-HBI10 TB/s die-to-die
- GPU Interconnect
- NVLink 51.8 TB/s per GPU
- TDP
- Up to 1,000 WIn HGX B200 reference; OEM cooling governs
- Common Form Factors
- HGX B200 (8-GPU baseboard)GB200 NVL72 compute tray
- Networking
- ConnectX-7Quantum-2 InfiniBand or Spectrum-X Ethernet
- FP4 Performance
- Exact GPU specification; state precision and sparsity
03Deployment scope
Our B200 Deployment Scope
Specialist crews for every physical stage of a GPU deployment, coordinated with OEMs, facility operators and other trades.
01
Hyperscale GPU rack integration and deployment
Receiving, positioning and integration of rack-scale GPU systems across rows, halls and phases.02
Structured fiber and copper cabling
High-density fiber and copper installed, dressed and labeled to the approved cable schedule.03
Hardware installation and preparation
Servers, switches, optics and rack components prepared and installed to the exact OEM configuration.04
Physical verification and QA
Inspection against the approved configuration, agreed physical-layer testing and remediation.05
Technical documentation and handoff
Labels, cable records and as-built documentation, handed to the owner or the next contractor.
04Deployment differences
HGX B200 vs GB200 NVL72 — Deployment Differences
HGX B200 (8-GPU)
HGX B200 is an eight-GPU baseboard used in OEM servers. Check the particular server rails, rack clearances, weight, cords and cooling design. Physical placement and external cabling are distinct from internal chassis service, POST, firmware configuration and software burn-in.GB200 NVL72
GB200 NVL72 has 72 Blackwell GPUs and 36 Grace CPUs in a rack-scale NVLink domain. The DGX reference uses liquid-cooled CPU/GPU compute trays plus ancillary airflow. Agree the physical assembly and cabling interfaces for the exact configuration. See the GB200 NVL72 page.

05Rack workflow
Start the B200 rack workflow from the delivered system and its installer
A B200 rack-assembly request must first say what will arrive. The HGX baseboard, an OEM-configured server containing it and a complete NVIDIA DGX B200 system are different work objects. The DGX B200 guide identifies a complete eight-GPU, 10U rackmount system.
NVIDIA's DGX B200 quickstart says the system must be installed by NVIDIA partner-network personnel or NVIDIA field service engineers, and asks the customer to provide relevant site information to the Installation Partner. This is the named DGX requirement, not a statement about every HGX OEM system. NVIDIA's DGX B200 introduction says network cables and adaptors are not shipped with the system.
Named primary context: DGX B200 system and shipment descriptions and DGX B200 installation-party requirement, checked October 19, 2026. No warranty entitlement is decided, and no operating, software, power, mounting or service procedure is reproduced.
06Explicit handoffs
Use explicit handoffs through the physical rack work package
The buyer workflow below separates decisions and work outputs. It is not a universal field-installation sequence: the actual OEM procedure, equipment condition, site restrictions and authorized parties govern the physical work. A rack quote must not silently become internal server or baseboard assembly, or turn an agreed cable observation into software or system commissioning.
| Work-package phase | Required handoff or output | Responsibility boundary |
|---|---|---|
| Identify the delivered configuration | Exact OEM model, assembled delivery unit, equipment population, included kits and applicable installation documents. | Supplier and OEM identify the supported system. GPU count alone does not release internal chassis work. |
| Confirm readiness and permitted parties | Actual site and access returns, material responsibilities, appointed installer and unresolved prerequisites. | Customer, site and applicable OEM parties decide their authority and readiness; no general contractor label satisfies a named DGX installer condition. |
| Receive and perform agreed physical integration | Receiving or staging records, then only the separately permitted placement, rack assembly and external cabling tasks. | The agreed physical team works within its actual authorization, equipment instructions and confirmed resources. Internal assembly, electrical, liquid-side and software tasks are not silently added. |
| Return the defined physical checks | Included identity, cable, label and defect observations, checked source revision and any separately agreed method-specific evidence. | The party providing each result identifies its actual scope. A documented physical check is not OEM system qualification or a software health test. |
| Close the physical package and transfer open interfaces | Included work, returned evidence, unresolved items, decision owners and the actual agreed acceptance disposition. | Customer and specialist owners decide their separate technical, operating and contractual boundaries; physical handoff does not declare the whole cluster commissioned. |
07Platforms
Related Resources
Contact
Discuss Your Infrastructure Project
Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.