What Is Redline Drawings?_
They capture the actual placement of racks, cable routes, cooling connections, and network links after physical work is complete. The marked set becomes the source for producing final as-built documentation. Updates are made by the installation crew using pen or digital markup tools during the build and commissioning phases.
Technical Details
Markups note changes to structured cabling paths, power whip terminations, and manifold connections for liquid cooling loops. They also record the final port assignments on GPU networking switches and the actual lengths of copper NVLink cables inside each rack. Redlines are reviewed against test results before the drawings are accepted as the record set.
How Leviathan Systems Works with Redline Drawings
Leviathan field crews produce redlines for every rack row during GPU cluster commissioning, noting any adjustments to fiber trunk routing or cooling distribution that differ from the original plans.
Related service
Network Testing & Commissioning →