What Is Method of Procedure?_
It lists prerequisites, required tools, safety steps, and verification points so that the work is performed the same way by any qualified crew. In GPU cluster deployments the document covers both mechanical and network activities and requires sign-off at defined hold points. The procedure remains under version control and is updated only after formal review.
Technical Details
A typical MOP for rack commissioning references the OEM torque values for bus-bar and manifold connections without stating numeric limits. It separates intra-rack NVLink copper links from MPO-terminated scale-out InfiniBand or Ethernet cables and requires continuity and polarity checks on the latter before power is applied. Liquid-cooling sections of the procedure call for pressure-hold tests and leak inspection of the secondary loop prior to electrical energization. All steps include fields for recording measured values and the technician’s initials.
How Leviathan Systems Works with Method of Procedure
US field crews use methods of procedure for every phase of H100 and GB200 NVL72 rack deployment, from initial mechanical assembly through final GPU networking validation and cooling-system commissioning.
Related service
Network Testing & Commissioning →