LEVIATHAN SYSTEMS

Comparisons

Data Center GPUs by Memory Capacity: Compare the Exact Variant

Technical contentPublished Updated

For a useful GPU memory comparison, compare the exact product variant and memory local to one GPU. Selected documented AMD Instinct MI350X and MI355X GPUs each list 288 GB; NVIDIA's current Blackwell Ultra datasheet distinguishes 279 GB per GPU in its GB300 NVL72 column from 270 GB in its HGX B300 column. Newer MI455X and Rubin specifications need their own platform and availability checks. None of these capacity figures establishes application speed, usable free memory or delivery availability.

Set the comparison boundary before calling a GPU the largest

This is a selected comparison of vendor-published data center GPU memory specifications checked on October 15, 2026. It answers a specific question: how much local GPU memory does the named variant list? It does not rank every accelerator on the market, establish which product is most popular or choose the fastest GPU for an application. The table retains the manufacturer's GB labels and memory types; it does not silently convert them into a measured application allocation.

The selection includes AMD Instinct OAM modules and named NVIDIA data center configurations. RTX PRO 6000 is explicitly the Blackwell Server Edition, not a shorthand for every workstation card. Consumer GeForce products, modified cards, CPU RAM, host-memory expansion and non-GPU accelerators are outside this table. Those products can be useful, but adding them without their own support, form-factor and workload boundaries would make a data center comparison less precise.

Treat each row as a specification reference. A product page establishes a documented product; it does not establish an OEM's stock, a cloud provider's inventory, a delivery date or compatibility with your existing server.

References: [N4]

Compare selected documented variants by published memory capacity

The rows below are ordered by the cited capacity figure, with ties kept explicit. The two Blackwell Ultra rows deliberately retain their system-column names. Quoting one unqualified B300 number would hide a distinction that NVIDIA's current datasheet makes.

The OAM entries describe accelerator modules in a supported server platform, not interchangeable PCIe add-in cards. Likewise, an SXM or HGX label is not permission to fit a GPU into another generation's chassis. The memory figure is a shortlist input; obtain the complete OEM system identifier before turning it into an installation or purchase requirement.

References: [A1][A2][A3][A4][N1][N2][N4]

Scroll the table horizontally on smaller screens.

Selected data center GPU memory specifications, checked October 15, 2026
Exact cited variantPublished local memory per GPUMemory typeSource boundarySource
AMD Instinct MI355X OAM288 GBHBM3EAMD MI355X product specification [A1][A1]
AMD Instinct MI350X OAM288 GBHBM3EAMD MI350X product specification [A2][A2]
Blackwell Ultra GPU in GB300 NVL72 column279 GBHBM3ENVIDIA Blackwell Ultra datasheet, page 5 [N2][N2]
Blackwell Ultra GPU in HGX B300 column270 GBHBM3ENVIDIA Blackwell Ultra datasheet, page 5 [N2][N2]
AMD Instinct MI325X OAM256 GBHBM3EAMD MI325X product specification [A3][A3]
AMD Instinct MI300X OAM192 GBHBM3AMD MI300X product specification [A4][A4]
NVIDIA B200 SXM in cited HGX reference architecture180 GBHBM3eNVIDIA HGX reference architecture, Table 1 [N1][N1]
NVIDIA H200 SXM in cited HGX reference architecture141 GBHBM3eNVIDIA HGX reference architecture, Table 1 [N1][N1]
NVIDIA RTX PRO 6000 Blackwell Server Edition96 GBGDDR7NVIDIA Server Edition product specification [N4][N4]
NVIDIA H100 SXM in cited HGX reference architecture80 GBHBM3NVIDIA HGX reference architecture, Table 1 [N1][N1]

Source-linked references are listed below. This is a selected specification comparison, not a stock list, benchmark or universal GPU ranking. Source labels are preserved; no common usable-memory adjustment has been applied.

Resolve architecture and system numbers without inventing an explanation

NVIDIA's Blackwell Ultra architecture article describes a maximum of 288 GB and explicitly says available HBM capacity varies by SKU. Its current Blackwell Ultra datasheet lists 279 GB and 270 GB in the individual-GPU rows for two different system columns. These are different source scopes. Use the figure belonging to the product you are evaluating, and attach its document edition to the comparison.

Do not explain the numerical difference as ECC overhead, a GB-to-GiB conversion or a particular reserved-memory mechanism unless the applicable product documentation establishes that explanation. The arithmetic alone cannot tell you why the figures differ. The same discipline applies when a Blackwell architecture headline and a B200 system specification show different capacities.

A useful vendor clarification is concrete: which full system SKU and revision are you quoting, what GPU-local capacity does its specification promise, and what total should the supported runtime report? That question is more useful than asking the seller whether its GPU has the internet's most frequently repeated number.

References: [N1][N2][N3]

Keep newer platform specifications separate from delivery evidence

AMD publishes 432 GB HBM4 for MI455X in its MI400-series material. NVIDIA publishes 288 GB HBM4 per Rubin GPU on the Vera Rubin NVL72 product page. These newer-platform specifications belong in a current research shortlist, but they do not establish that a buyer can obtain the required OEM system in a particular country, quantity or project window.

AMD describes Helios as a reference design for partners, rather than a finished AMD system for sale. Its stated deployment timetable is a vendor expectation, not a verified delivery commitment for your project. For both platforms, ask the actual supplier to identify the complete offered system, release state, qualification status, supported software and delivery conditions. A sales-contact button or a date on a roadmap does not close those questions.

The highest published capacity in this guide's selected examples is MI455X's 432 GB. That is a statement about the cited specification set. It is not a claim that MI455X is the largest GPU ever made, generally available in every region or the best choice for every workload.

References: [A5][N5]

Scroll the table horizontally on smaller screens.

Newer platform specifications requiring separate offer and availability confirmation
Named GPUPublished memory per GPUWhat remains project-specificSource
AMD Instinct MI455X432 GB HBM4 [A5]Actual OEM system offer, release/qualification state and delivery window[A5]
NVIDIA Rubin GPU288 GB HBM4 [N5]Actual OEM system offer, release/qualification state and delivery window[N5]

Public specifications checked October 15, 2026. No customer account, supplier allocation or purchasable inventory was inspected.

Do not turn a server or rack total into one GPU

NVIDIA's cited HGX reference table gives H200 SXM 141 GB per GPU. Eight times that capacity is 1,128 GB across eight GPUs. That multiplication tells you the aggregate installed capacity in the named configuration. It does not turn the node into a single 1,128 GB GPU or establish how an application partitions its data.

The Vera Rubin page makes the hierarchy especially clear: its table separately lists 288 GB of HBM4 for one Rubin GPU, 576 GB for a two-GPU superchip and 20.7 TB for the 72-GPU rack. The same page lists Vera CPU memory separately. Do not relabel a combined fast-memory or CPU-plus-GPU total as GPU VRAM.

For a buyer's comparison, retain three fields: local memory per GPU, GPU count and aggregate GPU memory. Keep host CPU memory in a fourth field. Then ask the software owner how the intended job uses multiple devices. A large aggregate can be relevant, but the allocation and communication model still needs confirmation for that workload.

References: [N1][N5]

Distinguish published capacity, assigned memory and free memory

A published capacity figure is not a promise that the entire amount is free for one process. NVIDIA's nvidia-smi documentation distinguishes total, reserved, used and free frame-buffer memory. It also notes that reporting can depend on ECC state and that the driver may reserve some memory internally. These are reasons to record the actual supported configuration and observed figures, not reasons to subtract an invented universal percentage from every GPU.

A shared or partitioned offering adds another boundary. Confirm whether the service provides a complete physical GPU or an assigned instance/profile, and record the memory exposed to that allocation. The physical device's headline capacity is not automatically the tenant's entitlement. This guide does not prescribe a partition configuration or establish that every listed product exposes the same features.

Ask the workload owner to define the memory needed by the actual software and request profile. The answer should cover the selected model or dataset, precision, context/concurrency where applicable, runtime buffers and the intended operating margin. Keep the measured requirement separate from the product's advertised total, and retain the test configuration with the result.

References: [N6][N3]

Use memory to build a shortlist, then test the actual job

Hypothetical screening example: the software team records a need for 120 GB on each complete GPU allocation before applying its separately agreed operating margin. An 80 GB or 96 GB allocation fails that stated single-device capacity screen. A published 141 GB device passes the headline-capacity screen, but the team still has to confirm the actual allocation and free-memory behavior. Passing this screen does not establish that the application is supported, meets its latency target or leaves enough margin.

For a speed comparison, require a named workload, precision, software versions, batch or concurrency settings, hardware configuration and a measured outcome. Memory capacity is the amount the named device lists; memory bandwidth is a different specification. Neither is itself an end-to-end tokens-per-second result. A larger-capacity product can solve a fit constraint without establishing the fastest implementation for the buyer's job.

Record why a device was excluded: insufficient local memory, unsupported software, unsuitable system, unconfirmed delivery or an unmet measured target. That makes the shortlist auditable and avoids turning one attractive specification into a recommendation that has never been tested.

Close the system and site handoff after the hardware choice

Before the selection becomes an installation request, collect the exact OEM server or rack model, GPU variant and count, supported configuration, relevant document revisions and a named owner for software acceptance. The physical plan then needs its own approved rack layout, equipment interfaces, cable schedule, facility permissions and handoff criteria. More memory does not establish a site's power, cooling, access or support compatibility.

Use the existing server-comparison guide to organize OEM evidence, and the cloud-capacity guide when you are evaluating rented compute rather than buying equipment. If the project requires physical installation of customer-furnished equipment, Leviathan can discuss an agreed rack-and-stack and cabling scope at customer facilities. This comparison is not a quotation or a stock-availability statement. Identify the equipment supplier and delivery responsibilities in the project scope. Workload benchmarking and cloud provisioning are outside the physical installation package. Electrical, cooling and system commissioning responsibilities must remain with the project's appointed qualified owners.

References: [L1]

Common planning questions

Which GPU has the most VRAM in this comparison?

The largest cited per-GPU figure in these selected examples is AMD's published MI455X specification of 432 GB HBM4. Its actual OEM system, qualification and availability must be confirmed separately. This is not an exhaustive market ranking.

Is B300 a 288 GB, 279 GB or 270 GB GPU?

NVIDIA's architecture article describes up to 288 GB with SKU variation. The cited Blackwell Ultra datasheet lists 279 GB in the GB300 NVL72 individual-GPU column and 270 GB in the HGX B300 column. Match the exact offered system to its current specification rather than applying one number to the whole family.

Does more GPU memory mean faster AI inference?

Capacity alone does not establish inference speed. Confirm the memory requirement, then compare measured results for the same workload, precision, software and operating settings.

Can I treat eight GPUs as one device with eight times the memory?

An aggregate installed-memory total does not by itself establish one device's addressable allocation or how the application uses multiple GPUs. Keep per-device and system totals distinct and confirm the software's distribution model.

Primary sources

  1. [A1] AMD Instinct MI355X product specificationsChecked 2026-10-15. Dedicated-memory and OAM fields only; no vendor performance or supply claim adopted.
  2. [A2] AMD Instinct MI350X product specificationsChecked 2026-10-15. Dedicated-memory and OAM fields only; no interchangeability or server compatibility claim.
  3. [A3] AMD Instinct MI325X product specificationsChecked 2026-10-15. Current product specification lists 256 GB; supersedes older roadmap expectations for this comparison.
  4. [A4] AMD Instinct MI300X product specificationsChecked 2026-10-15. 192 GB HBM3 per accelerator; no adoption of legacy Leviathan comparative performance/thermal claims.
  5. [A5] AMD Instinct MI400 Series and Helios reference-design FAQChecked 2026-10-15. MI455X published specification and reference-design status. Vendor expected deployment timing is not verified availability for a customer.
  6. [N1] NVIDIA HGX H100/H200/B200 reference architecture: Components, Table 1Checked 2026-10-15. Table is explicitly H100 SXM, H200 SXM and B200 SXM; page states last updated August 31, 2026. Do not generalize to all named-family variants.
  7. [N2] NVIDIA Blackwell Ultra datasheet: Technical Specifications, page 5Checked 2026-10-15. Individual-GPU columns distinguish GB300 NVL72 (279 GB) from HGX B300 (270 GB). Do not assign 279 GB to every B300 or explain the delta without supporting product evidence.
  8. [N3] NVIDIA: Inside Blackwell Ultra, architecture and SKU qualificationsChecked 2026-10-15. August 22, 2025 architecture article: maximum 288 GB and explicit capacity variation by SKU. No speedups, model-fit promises or benchmark results adopted.
  9. [N4] NVIDIA RTX PRO 6000 Blackwell Server EditionChecked 2026-10-15. 96 GB GDDR7 for Server Edition only. Not a consumer/workstation product substitution or popularity assertion.
  10. [N5] NVIDIA Vera Rubin NVL72 specificationsChecked 2026-10-15. Separate one-GPU, superchip, rack and CPU-memory columns. No interpretation of sales-contact page as purchasable regional inventory.
  11. [N6] NVIDIA System Management Interface: FB Memory UsageChecked 2026-10-15. General reporting definitions and documented caveats, not measured free memory on a Leviathan/customer system.
  12. [L1] Leviathan rack-and-stack service scopeChecked 2026-10-15. Bounded physical service subject to project scope, facility authorization and team availability; no GPU/material sales, licensed engineering or technical qualification inferred.

Planning physical installation of a selected system?

Share the customer-furnished equipment list, exact OEM system, site constraints and approved physical handoff requirements so the installation scope can be discussed.

Discuss a ProjectEmail Project Scope