Data Center Design_
AI workloads are fundamentally reshaping data center design. Traditional facilities designed for 5–15 kW per rack are being replaced or retrofitted for 40–120+ kW per rack. This density change cascades through every design decision: power distribution must scale from kilowatts to megawatts per row, cooling systems must transition from air to liquid, floor loading must support racks exceeding 1,300 kg, and cable pathway systems must accommodate 10x more fiber alongside liquid cooling lines.
Leviathan Systems Scope_
Leviathan Systems works within new-build and retrofit data center environments, deploying GPU infrastructure that integrates with the facility’s power, cooling, and physical design. Our pre-deployment site surveys identify capacity constraints and infrastructure requirements before any equipment arrives.
Articles_
In-depth field articles on this topic are publishing on a rolling basis. In the meantime, see our field guides and the resources above.
Ready to Deploy Your GPU Infrastructure?_
Tell us about your project. Book a call and we’ll discuss scope, timeline, and the best approach for your deployment.
Book a Call