# Hyperscale GPU rack integration and deployment.

Deploy & RelocateServices

Receiving, rack integration, cabling, verification and handoff delivered as one physical deployment program, across rows, halls and phases, for Vera Rubin NVL72, GB300 NVL72 and B300.

[Book a Call](https://www.leviathansystems.co/book-a-call?service=turnkey-gpu-deployment&from=%2Fservices%2Fturnkey-gpu-deployment)[Request Deployment Team](https://www.leviathansystems.co/project-inquiry?intent=deployment-team)

![A row of racks holding large GPU chassis, each flanked by power cords dressed in uniform loops.](https://www.leviathansystems.co/_next/image?url=%2F_next%2Fstatic%2Fmedia%2Ffield-gpu-rack-row.0ee0acdd.jpg&w=3840&q=90&dpl=dpl_BVdzhBr8ftQgJU3Jmv3LcrTGHwMc)

GPU rack row after integration and cabling.

Proof at scale

-   P-01
    
    Mobilization in as little as 24 hours.
    
    For qualifying engagements, subject to location, project scope, staffing and site access.
    
-   P-02
    
    1,500+ Racks of hyperscale GB300 deployment experience.
    
-   P-03
    
    Vera Rubin NVL72, GB300 NVL72 and B300: Crews ready for the latest NVIDIA platforms.
    

Service area

United States

01Scope

## Physical GPU deployment scope.

For hyperscalers, AI infrastructure operators and GPU cloud providers bringing rack-scale capacity online, and for the developers and integrators delivering it. See [tenant-side colocation installation](https://www.leviathansystems.co/services/colocation-installation) for provider access and change-window requirements.

-   S-01
    
    ### Receiving and staging
    
    Racks and equipment received, inspected and reconciled at the dock, then staged by row and delivery wave.
    
-   S-02
    
    ### Rack integration and positioning
    
    Racks integrated and set in position to the approved layout, with rack movement agreed with the responsible party.
    
-   S-03
    
    ### High-density cabling
    
    Back-end, front-end and out-of-band fabrics cabled to the approved schedule: trunks, breakouts, dressing and labels.
    
-   S-04
    
    ### Physical verification
    
    Placement, labels, port maps and agreed physical-layer tests closed rack by rack.
    
-   S-05
    
    ### Phased delivery
    
    Programs planned by hall, row and delivery wave, with crews allocated to equipment arrivals and site readiness.
    
-   S-06
    
    ### Documentation and handoff
    
    As-installed records handed to the platform team at the close of each wave.
    

Liquid-side cooling work, facility electrical and mechanical construction and cluster software commissioning stay with the cooling contractor, the facility owner and the platform team.

02Method

## Rack installation, verification and handoff.

Six stages, each with a named output. Coordination with OEMs, facility operators and other trades is planned from the first stage.

1.  01
    
    ### Project scope and site requirements
    
    Work package, quantities, drawings, site rules and acceptance criteria reviewed and agreed.
    
    Output
    
    Scope definition
    
2.  02
    
    ### Technical planning and resource allocation
    
    Methods, sequence, tools and test equipment planned; crew size and shifts allocated to the schedule.
    
    Output
    
    Execution plan
    
3.  03
    
    ### Mobilization and site coordination
    
    Access, inductions and logistics arranged with the facility operator, the OEM and other trades.
    
    Output
    
    Mobilization plan
    
4.  04
    
    ### Physical installation and cabling
    
    Racks, equipment, fiber and copper installed to the approved layout and cable schedule.
    
    Output
    
    Installed racks
    
5.  05
    
    ### Inspection, agreed testing and remediation
    
    Work inspected, agreed tests run, defects logged, remediated and rechecked.
    
    Output
    
    Closed defects
    
6.  06
    
    ### Documentation and handoff
    
    Rack, cabling and test records assembled and handed to the owner of the next stage.
    
    Output
    
    Handoff package
    

![A long row of open-rear server racks with vertical power distribution units and power cords dressed in repeating loops.](https://www.leviathansystems.co/_next/image?url=%2F_next%2Fstatic%2Fmedia%2Ffield-rack-row.f1875e91.jpg&w=3840&q=90&dpl=dpl_BVdzhBr8ftQgJU3Jmv3LcrTGHwMc)

Rapid response

Proposal Friday. Crew on site Monday.

Rack row after installation and cable dressing.

Rapid response

Proposal Friday. Crew on site Monday.

03Platforms

## Ready for Vera Rubin NVL72.

The latest NVIDIA platforms. Product names identify the equipment; the scope follows each OEM configuration.

-   Next generation
    
    ### Vera Rubin NVL72
    
    Deployment programs for Vera Rubin NVL72, planned to the OEM configuration and the site's delivery waves.
    
    [Platform requirements](https://www.leviathansystems.co/gpu/nvidia-rubin)
    
-   Blackwell Ultra
    
    ### GB300 NVL72
    
    Rack integration, high-density cabling and verification, backed by 1,500+ racks of hyperscale GB300 deployment experience.
    
    [Platform requirements](https://www.leviathansystems.co/gpu/nvidia-gb300)
    
-   Blackwell Ultra
    
    ### B300
    
    HGX B300 and DGX B300 systems racked, cabled and verified to the exact OEM configuration.
    
    [Platform requirements](https://www.leviathansystems.co/gpu/nvidia-b300)
    

04Questions

## Complete deployment FAQ.

### Is this a full turnkey data center or GPU-cluster service?

It is the complete physical deployment of the racks: receiving, integration, cabling, verification and handoff, delivered as one program.

### Can one physical deployment scope begin after receiving or rack assembly is already finished?

Yes. The program starts at whichever stage your project has reached.

### Can you guarantee the deployment date or a production-ready cluster?

We commit to a schedule once site readiness, equipment arrivals and access are confirmed, and staff the crews to it.

### Who supplies equipment and materials?

You or your appointed suppliers. We reconcile every delivery against the build list and flag gaps before installation.

### Can rack work proceed while a cabling input is unresolved?

Yes, where the rack work does not depend on it. Dependent cabling waits for the released input, so nothing is installed twice.

### How should we plan the people needed for parallel workfronts?

By workfront. Each hall, row or delivery wave gets its own crew plan, sized to equipment arrivals and site readiness.

05Related

## Related services.

-   [
    
    Plan & Source
    
    ### Rack assembly & preparation
    
    Receiving, staging, preparation and rack assembly to the approved configuration.
    
    View service
    
    ](https://www.leviathansystems.co/services/gpu-assembly)
-   [
    
    Build & Validate
    
    ### Structured cabling & fiber
    
    Fiber and copper to the cable schedule, dressed and labeled.
    
    View service
    
    ](https://www.leviathansystems.co/services/structured-cabling)
-   [
    
    Build & Validate
    
    ### Physical-layer verification
    
    Inspection, agreed testing, defect tracking and closure.
    
    View service
    
    ](https://www.leviathansystems.co/services/network-testing)

### Further reading

-   [
    
    GB200 NVL72 Rack Installation Planning
    
    GPU platform
    
    GPU platform](https://www.leviathansystems.co/gpu/nvidia-gb200)
-   [
    
    Site Readiness Before GPUs Arrive
    
    Article
    
    Article](https://www.leviathansystems.co/articles/site-readiness-before-gpus-arrive)
-   [
    
    As-Built Handoff Package
    
    Article
    
    Article](https://www.leviathansystems.co/articles/as-built-handoff-package-gpu-deployment)
-   [
    
    Who Deploys GB200 and GB300 NVL72?
    
    Article
    
    Article](https://www.leviathansystems.co/articles/who-deploys-gb200-gb300-nvl72)

Contact

## Planning a hyperscale deployment?

Share your project scope, deployment schedule and infrastructure requirements. We will review the work package and discuss execution options.

[Book a Call](https://www.leviathansystems.co/book-a-call?service=turnkey-gpu-deployment&from=%2Fservices%2Fturnkey-gpu-deployment)[Request Deployment Team](https://www.leviathansystems.co/project-inquiry?intent=deployment-team)

Email

[info@leviathansystems.co](mailto:info@leviathansystems.co?subject=Physical%20infrastructure%20project%20scope&body=What%20you%20need%20\(deployment%20team%2C%20project%20scope%20or%20capability%20statement\)%3A%20%0ARequested%20service%3A%20Hyperscale%20GPU%20Rack%20Integration%20%26%20Deployment%0AName%3A%20%0ACompany%3A%20%0ASite%20location%3A%20%0ATarget%20start%3A%20%0AProject%20description%20\(racks%2C%20platform%2C%20scope%20of%20work\)%3A%20%0AHow%20did%20you%20find%20us%3F%20\(optional\)%3A%20%0AOriginating%20page%3A%20https%3A%2F%2Fwww.leviathansystems.co%2Fservices%2Fturnkey-gpu-deployment%0A)

[Canonical page](https://www.leviathansystems.co/services/turnkey-gpu-deployment)
