# GPU rack assembly and hardware preparation.

[Canonical service page](https://www.leviathansystems.co/services/gpu-assembly) · Service group: [Plan & Source](https://www.leviathansystems.co/services#plan-and-source)

Equipment received, reconciled and prepared, then built into racks to the approved configuration, ready for burn-in, shipment or onsite deployment.

- Experience: 1,500+ racks of hyperscale GB300 deployment experience
- Mobilization: As little as 24 hours for qualifying engagements
- Platforms: NVIDIA Vera Rubin NVL72, GB300 NVL72 and B300

## Built to the approved configuration.

For GPU cloud providers, AI infrastructure operators and integrators preparing equipment from one or several suppliers for rack integration, at your staging location or on site.

### Receiving and reconciliation

Deliveries matched to the order and build list; serials, quantities and condition recorded; discrepancies routed to the decision owner.

### Build-input review

Equipment brief, rack configuration and accessory list checked for missing parts and specifications before assembly.

### Hardware preparation

Rails, mounting kits, components and accessories fitted and staged rack by rack.

### Rack assembly

Servers and switches mounted to the released elevation, with every unit identified.

### In-rack cabling

The physical interconnections of the build plan installed, dressed and labeled.

### Release package

Each rack released for burn-in, shipment or installation with its build record and open items.

BIOS and firmware changes, OS imaging and software commissioning stay with the platform team.

## Inputs frozen. Racks built. Changes traceable.

Four stages from build list to released rack. Qualifying engagements can mobilize in as little as 24 hours, subject to location, project scope, staffing and site access.

### 1. Freeze the build inputs

Models, alternatives, quantities and the rack configuration fixed before receiving.

Output: Released build list

### 2. Receive and reconcile

Deliveries checked against the build list; discrepancies held for a decision.

Output: Receiving register

### 3. Prepare and assemble

Equipment prepared and built into racks to the released configuration.

Output: Assembled racks

### 4. Release

Racks released to the next stage with the build record and open items.

Output: Rack build record

## Rack assembly FAQ.

### Can you work around a customer-supplied integrated GPU rack?

Yes. A factory-integrated rack is reviewed against its OEM instructions, and only the remaining physical tasks are planned. It is not rebuilt.

### Will the cluster be production-ready when you finish?

The racks are released physically complete, with their build record, to the team taking the next stage: burn-in, shipment or onsite deployment.

### Are you an authorized partner for the hardware manufacturer?

No OEM partnership or certification is claimed. The work follows the OEM documentation and your approved configuration.

### What should we send before scoping the installation?

Models and configuration, quantities, the rack plan, the delivery schedule and suppliers, the destination and the team receiving the racks.

### Can we discuss receiving or preparation without commissioning a complete rack build?

Yes. Receiving, preparation and assembly can each be scoped on their own.

### Where does receiving, staging or assembly take place?

At the location you name: your staging site, an integrator's facility or the destination hall. Space, access and custody are confirmed for the project.

### What if equipment arrives from several suppliers or customer inventory?

Each delivery is reconciled to the build it belongs to, and supply questions go to the appointed supplier or purchasing owner.

## Related services.

- [Hardware burn-in & validation](https://www.leviathansystems.co/services/hardware-burn-in-validation) (Build & Validate): Burn-in and QA to an agreed test plan, unit by unit.
- [Complete physical deployment](https://www.leviathansystems.co/services/turnkey-gpu-deployment) (Deploy & Relocate): Receiving to handoff as one deployment program.
- [Physical planning & CAD](https://www.leviathansystems.co/services/engineering-design) (Plan & Source): Layouts, elevations, cable schedules, labeling and as-built records.

### Further reading

- [Receiving and Staging GPU Equipment](https://www.leviathansystems.co/articles/receiving-staging-gpu-equipment)
- [Vera Rubin NVL72](https://www.leviathansystems.co/gpu/nvidia-rubin)
- [GB300 NVL72](https://www.leviathansystems.co/gpu/nvidia-gb300)
- [B300](https://www.leviathansystems.co/gpu/nvidia-b300)

## Plan the rack build.

Send the approved configuration, quantities, suppliers and destination. We will come back with the receiving and build plan.

Email: [info@leviathansystems.co](mailto:info@leviathansystems.co)