Leviathan deploys GB200 NVL72 from an approved OEM and site installation plan for its liquid-cooled compute and high-density cabling. GB200 NVL72 combines 72 Blackwell GPUs and 36 Grace CPUs in a rack-scale NVLink domain.

[Book a Call](https://www.leviathansystems.co/book-a-call)[Request Deployment Team](https://www.leviathansystems.co/project-inquiry?intent=deployment-team)

![NVIDIA GB200 NVL72](https://www.leviathansystems.co/_next/static/media/nv-05-nvidia-gb200-nvl72.fb98eede.jpg)

NVIDIA GB200 NVL72.[Image: NVIDIA.](https://nvidianews.nvidia.com/news/nvidia-blackwell-platform-arrives-to-power-a-new-era-of-computing)

01NVIDIA GB200

## What Is the NVIDIA GB200?

The NVIDIA GB200 NVL72 is a Blackwell rack-scale system with 72 GPUs, 36 Grace CPUs and fifth-generation NVLink. NVIDIA lists 13.4 TB of aggregate GPU memory. Its DGX reference rack uses 18 compute trays, each with four GPUs and two CPUs; exact OEM configurations must be checked against the supplied documentation.

NVIDIA describes roughly 120 kW consumption for the DGX GB reference rack. CPUs and GPUs use liquid cold plates, while other components still depend on airflow. Qualified facility and OEM teams approve power, cooling and placement requirements; Leviathan delivers the physical assembly, cabling and handoff.

02Specifications

## Technical Specifications

Architecture

Blackwell

GPU Memory

13.4 TB HBM3ePer NVL72 rack (NVIDIA published specification)

GPUs per Rack

72NVL72 configuration

TDP per Rack

Approximately 120 kWIn NVIDIA DGX GB reference; verify OEM input

Interconnect

NVLink 5.0InfiniBand NDR

Networking

400G ConnectX-7In DGX GB200 reference; OEM BOM governs

Cooling

Liquid-cooled computeAncillary airflow still required

Rack Weight

Exact OEM populated/shipping weight required

03Deployment scope

## Our GB200 NVL72 Deployment Scope

Specialist crews for every physical stage of a GPU deployment, coordinated with OEMs, facility operators and other trades.

1.  01
    
    ### Hyperscale GPU rack integration and deployment
    
    Receiving, positioning and integration of rack-scale GPU systems across rows, halls and phases.
    
    [View service](https://www.leviathansystems.co/services/turnkey-gpu-deployment)
    
2.  02
    
    ### Structured fiber and copper cabling
    
    High-density fiber and copper installed, dressed and labeled to the approved cable schedule.
    
    [View service](https://www.leviathansystems.co/services/structured-cabling)
    
3.  03
    
    ### Hardware installation and preparation
    
    Servers, switches, optics and rack components prepared and installed to the exact OEM configuration.
    
    [View service](https://www.leviathansystems.co/services/rack-and-stack)
    
4.  04
    
    ### Physical verification and QA
    
    Inspection against the approved configuration, agreed physical-layer testing and remediation.
    
    [View service](https://www.leviathansystems.co/services/network-testing)
    
5.  05
    
    ### Technical documentation and handoff
    
    Labels, cable records and as-built documentation, handed to the owner or the next contractor.
    
    [View service](https://www.leviathansystems.co/services/engineering-design)
    

Scope boundary

Facility electrical and mechanical work, liquid-cooling installation and cluster software commissioning stay with the facility owner, the OEM or the responsible trade.

04Deployment

## GB200 NVL72 Rack Installation Considerations

-   ### Power Distribution
    
    Rack input, upstream capacity and protection follow the exact OEM electrical specification and the approved facility design.
    
-   ### Structured Cabling
    
    The DGX GB200 reference uses ConnectX-7 400G adapters for scale-out networking. Agree the actual switch/adapter BOM, compatible connector and cable reach, polarity, port map and pathways before installation; NVLink scale-up and external fabric cabling are distinct systems.
    
-   ### Liquid Cooling
    
    NVL72 compute requires its OEM liquid-cooling system and approved site interface. The OEM and the facility's cooling specialists own CDU work, manifolds, fluid connections, leak and pressure tests and loop commissioning.
    

![Tiers of fiber breakout legs seated in high-density panel ports, each group gathered by a strap and fed through metal cable managers.](https://www.leviathansystems.co/_next/image?url=%2F_next%2Fstatic%2Fmedia%2Ffield-fiber-tiers.f5ebfe87.jpg&w=3840&q=90&dpl=dpl_BVdzhBr8ftQgJU3Jmv3LcrTGHwMc)

High-density fiber patching, tier by tier.

05Physical boundary

## Release the GB200 connection at the right physical boundary

A GB200 NVL72 rack does not have one interchangeable kind of fabric connection. In the named NVIDIA DGX GB system, the rack-internal NVLink path uses tray connections and a passive copper cartridge backplane. NVIDIA's September 17, 2026 hardware guide identifies four single-port ConnectX-7 cluster NICs per DGX GB200 compute tray, separate BlueField-3 storage and management hardware, and BMC interfaces. An external fabric scope must distinguish those boundaries before a cable description can become a physical work item.

Selected source boundaries, not an installation map or assembly quantity.
| Named boundary | What the source identifies | What a release still needs |
| --- | --- | --- |
| Rack-internal NVLink | Tray connections through the rack's copper cable-cartridge backplane. | Actual supplied assembly, OEM task boundary and any permitted field work; not a substitute for external fabric links. |
| Cluster scale-out | ConnectX-7 OSFP ports assigned to computenet in the DGX GB200 networking table. | Actual tray/port, remote switch/port, supported channel and released path. |
| Storage and in-band management | The source distinguishes BlueField-3 left and right QSFP port roles. | Exact card and port orientation from the applicable view, intended role and remote endpoint; a connector name does not decide these. |
| Out-of-band management | Named BMC RJ45 interfaces; the same table marks the separate LAN port Not Connected. | The actual BMC endpoint and customer-released management connection, rather than an assumption that every RJ45 is the intended port. |

Source facts: [NVIDIA DGX GB hardware](https://docs.nvidia.com/dgx/dgxgb200-user-guide/hardware.html) and [model-specific networking tables](https://docs.nvidia.com/dgx/dgxgb200-user-guide/networking.html), checked October 19, 2026. No port configuration, firmware choice, cabling method, topology approval, supported-part selection or actual site permission is supplied.

06Platforms

### Related Resources

Latest NVIDIA platforms

Earlier platforms

-   [GPU Rack Assembly](https://www.leviathansystems.co/services/gpu-assembly)
-   [Cooling Scope & Prerequisites](https://www.leviathansystems.co/services/liquid-cooling)

Contact

## Discuss Your Infrastructure Project

Tell us about your project, and our team will follow up to discuss the scope, requirements and availability.

[Book a Call](https://www.leviathansystems.co/book-a-call)[Request Deployment Team](https://www.leviathansystems.co/project-inquiry?intent=deployment-team)

Email

[info@leviathansystems.co](mailto:info@leviathansystems.co?subject=Physical%20infrastructure%20project%20scope&body=Requested%20service%3A%20Physical%20infrastructure%20installation%0ASite%20location%3A%20%0AEquipment%20and%20project%20inputs%3A%20%0ATarget%20window%3A%20%0AHow%20did%20you%20find%20us%3F%20\(optional%2C%20including%20ChatGPT%2FAI%20assistant\)%3A%20%0AOriginating%20page%3A%20%0A)

[Canonical page](https://www.leviathansystems.co/gpu/nvidia-gb200)